NAVIGATION

  1. From the Main Menu, click Administrators/Contract Instructions
    OR

    From the Main Menu, click Project Lists.  Click next to project in list, click Project Home button.  Note:  The project's home page will display.

  2. On the dropdown menu, click Procurement/Contract Instructions.
    Note: The project's contracts will list in the display view.

  3. Click next to Contract Number/Name/Role in display view list.
    Note: The contract's VOs and CMs will list in the details view with the 1st line of the description, date last modified & $ value.

 

Edit a Variation Order

The following is a list of all screen items for a variation order.  In most cases, only the status, authorised date, authorised by and the values will be changed.

 

  1. Select next to VO in contract instructions list in details view.  Click Edit at the bottom of the list.  Note: CM will display in the details view.
    Edit the following if required.

  2. Change primary consultant Reference Number in .

  3. Change Status from the .

  4. Change the Authorised Date (the date the VO was authorised) by either clicking on and selecting date or enter date in .
    Note: The system will automatically insert today's date if left blank after clicking
    Save.

  5. Change the  Authorised By from the .

  6. Change the Summary Description in the .  
    Note: The first line of the description will appear in the contract instructions list.

  7. Change the Cause from the .  If 'Other' enter cause in .

  8. Change Discipline from the .

  9. Change Estimate Value (excluding GST) in box.

  10. Change Contractor's Claim (excluding GST) in box.

  11. Change Approved Value (excluding GST) in box.
    Note:  GST $ Value & Total $ Value are automatically calculated and displayed after Save is clicked for 12, 13, 14).

  12. Change Funding Source from the .  If 'Other', enter funding source in .

  13. To Add an Attachment, click Browse to locate file (e.g. documents, drawings etc).  A Choose File dialogue window will display, use the Look In to locate the directory and document/file.

  14. Click on the file name, click Open to select file location and name.
    Note: The open attachment image, name of file and a remove box will display under the
    Browse button after you have clicked Save.  Repeat steps 12 & 13 to add another attachment.

  15. Click Save.
    Note:  Variation order will save and display in the details view.  If the status has been changed from Forecast or Pending to another the VO number will change from e.g. PO00x or FO00x to VO00x with VO number, GST value, total value calculated and attachment file names.  If you did not click Save, all changes will be lost.

  16. Click List to go back to contract instructions list.

 